Substructure
Site ClearanceSetting out of the building
Excavation of Trenches
Erection of form work for pad footings
Casting of pad footings
Blinding
Raising of Plinth Wall
Backfilling
Hardcore filling
Blinding
Laying of DPM and BRC
Casting of ground Slab
Superstructure
Setting out of block workLaying of DPC
Wall Partitioning
Setting out columns
Casting of Columns
Erection of Scaffolding
Erection of formwork for beam
Steel-work for beam
Casting of Concrete for beam
Roofing
Construction of Staircases
Construction of Septic Tanks